Recently, the 320-ton new double girder overhead crane designed and manufactured by our company for a well-known power equipment enterprise has been successfully installed, tested, and put into operation. Since the signing of the contract, the project has been completed on schedule through the joint efforts of multiple departments, marking another milestone in our breakthroughs in the field of ultra-heavy-duty crane manufacturing.

High Load Capacity to Meet Heavy-Duty Manufacturing Needs
The 320-ton double girder crane is mainly used for lifting and transporting core components in the customer’s large-scale power equipment workshop. Due to the heavy lifting capacity, complex working conditions, and high precision requirements, the project set extremely high standards for structural strength, safety redundancy, and operational stability from the design stage.
The crane adopts an optimized welded double-girder structure and high-strength alloy steel, significantly enhancing its load-bearing capacity and fatigue resistance. The main girder has undergone finite element analysis and dynamic stress testing, ensuring stability under full load without deformation or torsion.
Green and Energy-Efficient for Sustainable Development
The design fully considers energy conservation and emission reduction. Using high-efficiency motors and variable frequency drive technology, the crane reduces energy consumption while extending service life. Its regenerative braking system recovers and reuses part of the energy generated during operation, minimizing energy waste and aligning with modern green manufacturing principles.
Efficient Project Execution and Smooth Delivery
From project initiation to delivery, our project team efficiently completed design, manufacturing, transportation, installation, and commissioning. All key components underwent rigorous quality inspection and performance testing to ensure one-time acceptance. During installation, our experienced engineers were stationed on-site to guarantee precision and safety standards beyond industry requirements.
Accelerating Customer Production and Creating Greater Value
The introduction of the 320-ton double girder crane will significantly improve the customer’s production efficiency and lifting capacity, especially in manufacturing and assembling large heavy components. The customer expressed high satisfaction with the crane’s performance and plans to deepen cooperation with our company in future high-end crane projects.